New Greenfield Data Center LEED Silver Targeted
International On-line Services Client
Project Scope: Stand Alone Data Center Engineering Design & Commissioning Services
Project Size: 500,000 sq. ft.
Raised Floor Area: 20,000 sq. ft. per pod, 10 pods.
Tier Classification: III
Watts per sq. ft.: 100 w/sq. ft.
Redundancy: 2N
Air Conditioning Plant: Modular chiller plants, 2 chillers, towers, pump sets per module,
10 modules total
Diesel Generator: 29.6 MW
UPS System: Two 5-module parallel systems, 3000 kVA, 400/230 Volts per pod
Total Construction: $150 Million
|